Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | GS |
Model Number : | GSCJ-8301B1 |
Price : | USD+negotiable+pcs |
Payment Terms : | T/T |
Supply Ability : | 1+pcs+per days |
Delivery Time : | 1-7 days |
Installation Guide
1. Install the Rack: Ensure the rack is aligned and flush with the
base plate.
2. Secure the Columns: Use screws to fix the four columns firmly.
3. Attach the Side Panel: Align the holes and tighten the screws.
4. Position the Movable Side Panel: Ensure the bottom edge is close
to the rack.
5. Install the Base Plate: Push the circular pin of the latch
upward and move the side panel.
6. Install the Stopper: Attach it at the spring position, facing
downward.
Special Note: Pay attention to steps 4 and 5. The circular pin of
the latch must align precisely with the circular hole on the base
plate. Accurate positioning is crucial to avoid misalignment;
ensure synchronization in all directions.
GSCJ-8301B1 SMT Loader and Unloader Rack, PCB Board SMT Material Frame, Circuit Board Rack for Material Handling Cart | GSSMT, PCB Magazine Loader, PCB Magazine Rack, SMT PCB Magazine, PCB Magazine Unloader, PCB Magazine Handling, PCB Magazine Storage, PCB Magazine Transport, PCB Magazine Capacity, PCB Magazine Holder, PCB Magazine System.
![]() |